Production was started on the new hamster ball design over the last week.  Thanks to the lathe, two parts (that should have been completed in about 2 hours) were completed in about 10 hours.  This was due to the poor design of the lathe (and lack of CNC capabilities).

Four standard radial ball bearings were purchased to use in the shafts created on the lathe.  Pictures are below.
Finishing the end surface, preparing to cut hole for bearing
Drilling a hole  down the end to be tapped
Reducing the stock size
Finished product
Bearing inside stock